Dashboard

CIP application dashboard

The unified Construction Intelligence Platform workspace for bid intake, plan reading, assembly assignment, estimating, documents, and PM / field handoff.

TN Consulting & Solutions LLC

Enterprise demo workspace

End-to-end CIP workflow

Project → bid → document → takeoff → estimate

This uses shared browser mock data so the existing modules work as one path instead of isolated demos. Each step also links to the full module workspace.

1. Project + bid

2. Document + takeoff

Document: No document uploaded yet

3. Basic estimate

No estimate generated yet. Takeoff quantities are ready.

Use this connected demo path to move one project through CIP.Open estimating workspace

Active bids

4

1 due inside 7 days

Bid value in intake

$5,795,000

$1,448,750 average active bid

Missing required docs

3

Warnings active in Bid Intake

Ready for estimating

2/4

Checklist complete and no required-document gaps

CIP modules

Connected preconstruction workflow

Each card opens a working route inside the shared enterprise app shell.

Authentication

Access control scaffold

  • Session-aware route protection placeholder
  • Role model prepared for Executive, Estimator, PM, Field, and Admin
  • Future provider slot for Auth.js, Clerk, Supabase, or custom SSO
  • Security-first audit trail language built into the shell

Assemblies

Cost-code aware assembly examples

09-21-16

5/8" Type X drywall assembly

Unit: SF · Target margin: 22%

09-91-23

Interior paint system - walls

Unit: SF · Target margin: 28%

09-65-13

Resilient base package

Unit: LF · Target margin: 24%

10-26-00

FRP wall protection

Unit: SF · Target margin: 26%

Workflow

Bid-intake-to-handover traceability

1Bid invitation captured with client, contact, due date, and source
2Documents, addenda, drawings, specs, and missing requirements checked
3Scope items, assumptions, exclusions, and risk notes normalized
4Estimator receives complete intake package for takeoff
5Estimate margin review updates project and bid status
6Awarded work moves into PM and field handover